Johor Bahru-Singapore RTS Finally Linked With 65% Construction Completed
SEAToday.com, Johor Bahru-On Thursday (1/11) Malaysian Prime Minister Anwar Ibrahim met with his Singaporean counterpart, Lee Hsien Loong to witness the symbolic opening of the Johor Bahru-Singapore rail link. During their meeting, the two leaders signed a joint plaque to symbolize the two countries' shared commitment to connecting the two countries.
At an estimated cost of 2.15 billion US dollars, construction began in January 2021. As of December 31 last year, the construction of the 4-kilometer-long Johor Bahru-Singapore rapid transit system has reached 65 percent completion.
The project is expected to begin commercial operation in December 2026, carrying more than ten thousand passengers per hour.
During their meeting, the two leaders also witnessed the signing of the memorandum of understanding on the Johor-Singapore Special Economic Zone. (FELIX/ALVIN)
Recommended Article
News Update
Jakarta Election Commission Recommends Transfer Voters Arrive at...
Jakarta Election Commission recommends transfer voters arrive at polling stations between 11 AM and 1 PM.
Jakarta Provincial Government to Free Six-Month Flat Rent for Peo...
The Jakarta Provincial Government has announced that it will waive the rent for six months for all residents living under the toll road who have moved in to the flats.
The National Museum Exhibits 200 Keris Collections, Celebrating 1...
The event is part of the 19th anniversary of the designation of the Indonesian Keris as a World Cultural Masterpiece by UNESCO, which was announced on November 25, 2005 and then inscribed in UNESCO's Representative List...
Sara Duterte: Philippine VP Who Hired Hitman to Target President...
Sara Duterte is the Vice President of the Philippines who allegedly planned to assassinate Philippine President Ferdinand Marcos Jr.
Trending
- # Daily Update
- # Regional
- # Nasional
- # Internasional
Popular Post
SOEs Ministry Tries Out Four Days in Workweek System
The State-Owned Enterprises (SOEs) Ministry is testing the implementation of a four-day workweek. This was shared on Instagram @lifeatkbumn on Saturday (6/8).
TransJakarta Extends Operational Hours of Soekarno-Hatta Airport...
TransJakarta extended its service time until midnight for the corridor with destination to the Soekarno-Hatta International Airport, starting Wednesday (6/19).